Neales Waste Management are applying for planning permission for a revised working scheme, including extension of the mineral extraction and landfill areas, at Clayton Hall Landfill Site.
An Environmental Statement (ES) to accompany the application has been prepared by the Arley Consulting Company Limited. The ES has been designed so that you can download chapters of particular interest, or the whole ES. Chapter 1 "Introduction" explains the structure of the ES.
In reading any individual chapter, you may have to cross-refer to other parts of the ES, in particular Chapter 3 which describes the proposed revised working scheme, and the "Main Drawings" section.
- Environmental Statement List of Contents
- Report No 08469 129 Non Technical Summary
- Main Drawings: 08469-108
- Main Drawings: 08469-124B-A2
- Main Drawings: 08469-128-A3
- Main Drawings: 08469-131 Topographical Survey Nov 2014
- Main Drawings: 08469-132A A2 5m CONTOURS
- Main Drawings: 08469-134-A3 5m CONTOURS
- Main Drawings: 08469-136-A4
- Main Drawings: 08469-137-A3
- Main Drawings: 08469-138A A2 1 of 2
- Main Drawings: 08469-138A A2 2 of 2
- Main Drawings: Oakbay Design T239 202
- Chapter 1 - Introduction
- Chapter 2 - The Site & its Suroundings
- Ch2 Drawings: 08469-105-A2 5m CONTOURS
- Ch2 Drawings: 08469-127-A3
- Ch2 Drawings: 08469-133 Current Pre-Settlement A3
- Ch2 Drawings: 08469-14
- Ch2 Drawings: Oakbay T239-001
- Ch2: Appendices 2.1-2.5
- Ch2: Appendix 2.6 - Drawings
- Chapter 3 - Description of the Proposals
- Chapter 4 - Scoping and Consultation
- Ch4: Appendices 4.1 - 4.4
- Chapter 5 - Review of Planning Policy
- Chapter 6 - The Need for the Development
- Chapter 7 - Alternatives Considered
- Chapter 8 - Text
- Ch8: Appendix 8.1 - Methodology
- Ch8: Appendix 8.2 - Glossary of Terms
- Ch8: Appendix 8.3 - Photos
- Ch8: Appendix 8.4 - Figure1
- Ch8: Appendix 8.4 - Figure2
- Ch8: Appendix 8.4 - Figure3
- Ch8: Appendix 8.5 - Lancashire Valleys
- Ch8: Appendix 8.6 - Extract from Landscape Character Assessment of LancashireLCA
- Ch8: Appendix 8.7 - Drawing No T239 202
- Chapter 9 - Ecology
- Ch9: Appendix 9.1 - Biological Heritage Sites and Key Species Plan
- Ch9: Appendix 9.1 - Cont - Search Results for Species Raw Data
- Ch9: Appendix 9.2 - Clayton Hall Sand Quarry Ecological Survey & Assessment Report JMM
- Ch9: Appendix 9.3 - Badger Survey Report
- Ch9: Appendix 9.4 - Protected Species Report (Bats)
- Ch9: Appendix 9.5 - 1 Licence
- Ch9: Appendix 9.5 - 2. wml-a14-2_tcm6-4103 (1) Method Statement Revison 1 & Woks Schedule - 14.03.2014
- Ch9: Appendix 9.5 - 3 Plans Part 1
- Ch9: Appendix 9.5 - 4 Plans Part 2
- Chapter 10 - Geology
- Ch10: Appendix 10.1 - Part 1
- Ch10: Appendix 10.1 - Part 2
- Ch10: Appendix 10.2
- Ch10: Appendix 10.3
- Ch10: Appendix 10.4
- Ch10: Appendix 10.5
- Ch10: Appendix 10.6
- Ch10: Appendix 10.7
- Ch10: Appendix 10.8
- Ch10: Appendix 10.9
- Chapter 11 - Water Resources
- Ch11: Appendix 11.1
- Chapter 12 - Landfill Gas
- Ch12: Appendix 12.1 - Drawings
- Chapter 13 - Traffic
- Ch13: Appendix 13-1
- Chapter 14 - Environmental Noise Impact
- Chapter 15 - Odour, Air Quality and Dust Assessment
- Chapter 16 - Potential Effects on Local Amenity
- Ch16: Appendix 16.1 - Wind Rose Data
- Ch16: Appendix 16.2 - Daily Environmental Monitoring Form NWM181
- Ch16: Appendix 16.3 - EP07 Complaints Procedure & Report
- Ch16: Appendix 16.4 - NHRA 15 Waste Risk Assessment.pdf
- Ch16: Appendix 16.5 - Drawings/Drawing No 08469-108
- Ch16: Appendix 16.5 - Drawings/Drawing No 08469-48
- Chapter 17 - Population & Material Assets
- Ch17: Appendices 1-4
- Chapter 18 - Summary of Residual Effects